|

|
History
View Historical and Aerial Photography maps
by
clicking here. |
History of Novi's Name
(excerpt from NO. VI on the Trail – A history of Novi
Michigan written by Barbara G. Louie, Novi Historical
Commission. |
|
As early as 1959, the Village of Novi was
considering becoming a city. There were unsuccessful elections
toward Novi cityhood in 1959 and 1962. The Novi Village
Council again took formal action toward cityhood in 1966, although
Novi did not incorporate as a city until 1969. The Village
Council unanimously adopted a resolution in December of 1966 which
set the date for a special election of a Charter Commission and the
adoption of the City Incorporation Proposal. Originally
planned for April of 1967, the special election was delayed due to
court proceedings until May of 1968.
Residents took discussion of cityhood
seriously, as well they should have, since this was a large step
toward Novi's subsequent growth and economic vitality. From a
grass roots perspective, groups like the Novi Jaycees and the
Willowbrook Community Association had a part in Novi's incorporation
into a city. Jaycee members participated in a door to door
campaign in support of cityhood, and the Willowbrook Community
Association sponsored open forum meetings to discuss the overall
issue.
The special election in May of 1968 had 6,902
residents turn out to cast their votes for the charter commission.
The population (per the 1970 census) was 9,668. The top
nine candidates receiving the most votes became the Charter
Commission which had the responsibility of drafting Novi's first
city charter. The original members of the Charter Commission
were Raymond H. Evans, Joseph Crupi, William L. Duey, Denis M.
Berry, A. Russel Button, William D. Brinker, Edwin E. Presnell, J.F.
Buck and David S. Harrison. The Incorporation Proposal on the
ballot passed with a total of 694 votes to 283.
The first meeting of the new Novi City
Council was called to order by Raymond Evans, the chairman of
the Charter Commission, who administered the oath of office to Mayor
Joseph Crupi. It is at this meeting that the Council of seven
members, including the Mayor was established, and the organizational
rules of the new charter took effect.
Historic
American Engineering Record
Grand River Avenue Bridge (US Route 16 Bridge)
Location:
Spanning the Chesapeake and Ohio Railroad, City of Novi,
Oakland County, Michigan USGS Northville Quadrangle
UTM:
17.4706100.296000
Dates of Construction:
1925, 1929
Engineer:
Michigan State Highway Department
Builder:
Michigan State
Construction Division
Present Owner:
Oakland County Road Commission, 31001 Lahser
Road, Birmingham, Michigan 48010
Present Use:
Vehicular and Pedestrian Traffic
Significance:
This is the sixth longest concrete "camelback"
girder bridge left in Michigan. It created a grade separation for
Grand River Avenue, which at the time of construction was part of US
Route 16 linking Detroit with Grand Haven, Michigan, on Lake
Michigan.
Project Information:
This documentation was undertaken in June
1991, in accordance with a memorandum of Agreement by the Oakland
County Road Commission, the Michigan State Historic Preservation
Officer, and The Advisory Council on Historic Preservation as a
mitigative measure prior to the demolition of the bridge.
Dr. Charles K. Hyde, Department of History, Wayne State
University, Detroit, Michigan 48202
Grand River Avenue approximates the route followed by one of the
state’s oldest roads. Michigan’s Territorial Council authorized
construction of a road from Detroit westward to Lake Michigan, to be
called the Grand river Road because it met the Grand River near
Lansing and then followed it to Lake Michigan. It was known as the
Grand River Military Road as well. Although the Michigan Territory
surveyed the route all the way to Grand Rapids in 1832, the only
segment completed by Michigan’s entry into the Union in 1837 was the
part from Detroit to Brighton, including the section extending
through Novi. The grand River Road later reached Grand Haven on Lake
Michigan in the late 1840s and remained an important east-west
highway throughout the nineteenth century.
The Grand River Road is an excellent example of the evolution of
land transportation in Michigan and the Midwest. Originally an
Indian trail, the first segments built in the 1830s were of dirt
construction. A significant upgrading, the plank road became popular
in lumber-rich Michigan before the Civil War. A private corporation
planked the Grand River Road from Detroit through Farmington in 1836
and all the way to Lansing by 1851, operating it as a toll road. It
prospered as long as there was a regular stagecoach service between
Detroit and Lansing, and short-haul freight traffic. Following the
Civil War, it fell into disuse, unable to compete with the
railroads, and was neglected until the early twentieth century, when
automobiles began to use it extensively.
Starting on Grand River Avenue in downtown Detroit, a motorist
could travel along this highway, designated as US-16 early in the
twentieth century, from Detroit to Grand Haven. In 1956-1957, the
Michigan State Highway Department relocated and rebuilt US-16
between Farmington and Brighton, including the section through Novi,
as the Farmington-Brighton, Expressway, a four-lane, limited access
divided highway. This new highway then joined the Interstate Highway
System as I-96 around 1960, leaving the old Grand river Avenue as a
lightly traveled country road through most of its length. In the
1970s and 1980s, however, as former farm communities in western
Oakland County such as Novi became thriving bedroom communities,
Grand river Avenue again became a busy thoroughfare.
Before the construction of this grade separation, the Grand River
Avenue crossing of the two Pere Marquette Railway tracks was an
unmarked, completely unprotected crossing. Photographs taken on 13
December 1922 show a combination passenger/freight station and a
"milk station" just south of the crossing, along with a nearby
gasoline service station and several residences. Local farmers left
their raw milk in a frame building west of the tracks for transport
to dairies in Detroit. Railroad passenger service into Detroit was
also extensive, requiring stairways on all four corners of the
structure to allow passengers to descend from the street level above
to the railroad grade level below.
The Michigan State Highway Department built this bridge as part
of an effort in the mid-1920s to eliminate dangerous grade crossing
son major state trunkline highways. Before June 1924, the Highway
Department placed under contract a total of nine grade separations,
but in the biennium ending in June 1926, the Department contracted
for thirteen additional grade separations, including three on
Trunkline 16 (later, US-16). Most of the bridges built for this
purpose were reinforced concrete "camelback" girder bridges
constructed from standard Highway Department plans. The Grand River
Avenue bridge was a "twin" to at least three other structures built
in 1925-1926, except for its unique abutments.
The State Construction Division built the Grand River Avenue
bridge and other concrete bridges and concrete highways under the
State Force Account program, which involved the use of state prison
labor along with "free" skilled labor. About seven hundred inmates
worked on state bridge and highway projects during the height of the
construction seasons of 1925-1926. The State of Michigan did not use
prison labor for asphalt construction projects, seen as requiring
more "specialized," i.e., skilled, labor. The use of prison labor on
highway and bridge projects stopped in 1930, largely because of the
availability of large numbers of unemployed workers willing to take
these jobs. The State Highway Department estimated the total cost of
the Grand River Avenue bridge, excluding right-of-way expenses, at
$122,223.08. The Federal Government paid 47% of the total cost,
while "other participants," i.e., Oakland County and the Pere
Marquette Railway Company, paid the rest.
Construction started in October 1924 and the bridge opened to
traffic fourteen months later. Surviving construction photographs
show concrete poured between May and early November, 1925, so that
the work carried out over the first eight months focused on building
the massive earth approaches and preparing the reinforcing rods and
formwork for the concrete structural members. The photographs taken
by the State Highway Department serve as the primary documentation
of the construction chronology. The only local newspaper that
covered Novi on any regular basis, the Northville Record,
largely ignored the project until it was completed. That paper then
noted that the bridge required twenty-seven railroad carloads of
cement and that two men died during construction. H.J. Horan was the
resident engineer and R.D. Clark served as inspector, both from the
State Highway Department, while Sherman Williams was the
construction superintendent.
The earliest photographs documenting the bridge construction were
dated 19 May 1925 and show the wooden formwork built for the piers
and abutments. The contractor finished the piers by the end of June,
the abutments by the end of July, the main girders around 29 August
1925, and the floor beams in late September. They completed the
bridge deck by early November.
This structure has had few alterations since built in 1925. The
original bridge design provided for a 30-foot clear roadway with a
pair of 6-foot sidewalks each raised 8 inches above the road
surface. At some later point, before October 1932, the State Highway
Department removed the sidewalks to create a clear roadway of 42
feet. This may have taken place in 1929, when the Highway Department
lengthened and altered the retaining walls extending from the
abutments, along with the railings. They extended the retaining
walls at the northwest, southwest, and northeast abutment corners by
23 feet, with the new walls varying slightly in height from 10 feet
6 inches to 11 feet 6 inches. The Highway Department extended the
southeast retaining wall by 106 feet. It stood 10 feet 6 inches
high.
By April 1939, serious breakage of concrete at the tops of the
abutment piers where the main girders rested was evident, requiring
substantial repairs. Later deterioration of the concrete staircases
led Oakland County to block off the stair entrances with permanent
concrete barriers sometime in the 1960s.
The Grand River Avenue Bridge is a three span reinforced concrete
"camelback" girder structure resting on four piers, with the two
piers in the middle free-standing and the two outer piers
incorporated into the east and west abutments respectively. The
bridge proper measures 146 feet 9 inches long and 48 feet wide
overall. Because the Highway Department built this grade separation
on what was flat land, the bridge required lengthy earth approaches
and earth-filled reinforced concrete abutments. The east abutment is
82 feet 6.75 inches long, while the west abutment measures 67 feet 6
inches in length. The railroad line runs Southeast to Northwest,
while Grand River Avenue runs East, Southeast to West, Northwest,
resulting in a skewed bridge alignment. The bridge intersects the
railroad lines at an angle of 34 degrees, as opposed to 90 degrees
if the two were perpendicular.
None of the piers or abutments required pilings because they rest
directly on bedrock. The two center piers, which are identical, are
93 feet, 8.75 inches in length overall, measured from the outside
edges of the footing foundations. The piers are considerably longer
that the width of the bridge because of their skewed alignment. Each
pier consists of two basket arch segments that rest on a total of
three footings, all of reinforced concrete construction. All the
footing foundations are 2 feet 6 inches high and 10 feet wide, while
the two outside foundations are 12 feet 8 inches long and the center
one is 13 feet 9 inches long. The center footings for both piers are
rectangular, measuring 5 feet 2 inches wide, 8 feet 2 inch long and
6 feet 6 inches high and are surmounted by rectangular caps 5 feet 8
inches wide, 8 feet 7 inches long, and 1 foot 6 inches high. The
outside footings are oval-shaped, 8 feet 1 inch long and 5 feet 8.50
inches wide, surmounted by caps 4 inches larger in diameter. The
pier structure is 4 feet 2 inches wide where it rests on the center
footings and five feet in diameter where it rests on the outside
footings, but then tapers to 3 feet wide at its top, where it
supports the main bridge girders and deck. The pier structure above
the footing caps is 14 feet 8.5 inches high overall. The two
abutment piers, also identical to each other, have the same general
design as the center piers, but slightly larger footings and total
size. The pier support the concrete girders and floor beams and
provide clearance of 22 feet 6 inches between the top of the
railroad tracks and the bottom of the bridge.
The major structural support system comprising the bridge deck
consists of three pair of reinforced concrete "camelback" girders,
one pair for each span, with the girders placed on the outside edge
of the bridge. The rest of the structural system consists of pier
and abutment bearing walls and floor beams that extend either
parallel or perpendicular to the pier alignment. The bridge deck
then rests on the floor beams.
The "camelback" girders are similar in most dimensions except
length, with the eastern span 40 feet 5.75 inches long, the middle
span 65 feet 11 inches long, and the western span 40 feet 4.25
inches long. The girders are cambered, with the top of the center
span 2 feet 5 inches higher in the middle than at the ends, while
the tops of the two end spans are only 9 inches higher in the
middle. The center girder is 1 foot 9 inches thick at the top, for 2
feet only, but then is recessed to 1 foot 3 inches thick for 3 feet
9 inches before widening at the base to a thickness of 2 feet 7
inches, which it maintains over its entire length down to the
connections with the piers. The two end spans have slightly smaller
dimensions. The end portions of the center girders extend below the
middle horizontal segments to form the structural connection with
the piers, so that the girder has the same height of 9 feet 11
inches at the piers as in the middle of the girder. The center
girder also has pilasters over the piers, each pilaster 2 feet 6
inches wide at the base, narrowing to 1 foot 8 inches wide at the
top, 9.50 inches thick, and 9 feet 11 inches high.
The rest of the structural system supporting the bridge deck
consists of a pair of abutment bearing walls, each 2 feet six inches
wide and 5 feet 8.50 inches deep and two pier bearing walls, each 1
foot 6 inches wide and 5 feet 8.50 inches deep, all 93 feet 8.75
inches long, resting directly on the piers and abutments; eight
floor beams which run parallel to the piers and measure 1 foot or 1
foot 3 inches wide and 3 feet 1 inch deep, irregularly spaced and
supported by the girders; and twenty-one floor beams running
perpendicular to the piers, all measuring 1 foot 9 inches wide and 3
feet 2.50 inches deep and placed 9 feet apart, center-to-center,
also supported by the girders. The bridge deck is a monolithic
concrete slab 8 inches thick, which rested on the bearing walls and
floor beams described above. The road surface or pavement, poured on
top of the deck, is 7 inches thick at the center of the bridge and 3
inches thick at the curbs.
The skewed alignment of this bridge along with the need to build
large-scale earth embankments as approached resulted in massive,
skewed abutments. Because of heavy use of the railroad passenger
station at railroad grade level and the extensive pedestrian traffic
at this intersection, all four abutment or approach facades running
parallel to the roadway have stairways leading from the railroad
grade level to the roadway level above.
The two abutments are triangular, with the abutment piers forming
one side, a pair of outer abutment walls with staircases forming the
second side and a wall perpendicular to the roadway and supported by
the earth embankment, making up the third side.
The two abutments are mirror images of each other. The north wall
of the east abutment and the south wall of the west abutment are 67
feet 6 inches long, 8 feet 3 inches thick, and 31 feet 9.50 inches
high, excluding footings. They begin with and connect to the
northeast and southwest abutment piers respectively and run parallel
to the roadway and the bridge. Each wall has 5 reinforced concrete
buttresses that help support it. The buttresses are truncated
triangles, 25 feet 7 inches high, 8 feet 3 inches wide at the base
and 1 foot 3 inches wide at the top. Four of the five are 1 foot 6
inches thick, while the remaining one is 3 feet thick. The third
side of each abutment is a reinforced concrete wall, 10 feet 6
inches wide, 53 feet 6 inches long, and 26 feet 6 inches high, which
runs perpendicular to the roadway. Each connects at its end with the
southeast and northwest abutment piers respectively, and is
supported by three concrete buttresses, all 1 foot 6 inches thick,
with the same overall dimensions as the others. The result is a
bridge with two large open abutment spaces flanked by thick walls
and protruding buttresses.
Three of the four abutment wing walls extending from the bridge
are virtually identical, while the fourth, at the southeast corner,
is distinct. The three similar ones measure 67 feet 6 inches long,
31 feet 9. 50 inches high and 8 feet 3 inches thick.
The southeast abutment wall originally had the same overall
dimensions as the others, but grew in length some 142 feet 1.50
inches in 1929 when the retaining walls were altered. It now extends
for a total of 209 feet 7.50 inches. The Highway Department also
modified the design of the balustraded railings in 1929, when
rectangular fluted spindles replaced the original rounded ones.
Each abutment wing wall is surmounted by concrete railings
divided into panels by pilasters that correspond to the supporting
buttresses, with the end panels solid and the rest balustraded. The
panels vary in length from 8 feet 2 inches to 10 feet
center-to-center. The end pilasters are 3 feet 5 inches high,
including a base 10 inches high, 1 foot 6 inches wide and 1 foot 4
inches deep and a cap of the same dimensions. The center of the end
pilasters is 1 foot 9 inches high, 14 inches wide, and 1 foot thick,
with a 1 inch rectangular beveled recessed panel. The intermediate
pilasters are 3 feet 3.75 inches high, 1 foot 4 inches square at the
base and cap, 1 foot wide, and 7 inches thick. The upper and lower
rails on the balustraded segments are 8 inches high and 6.50 inches
thick. The spindles are 1 foot 9.25 inches high, with a cap 7.50
inches by 6.50 inches by 2 inches high and a base 8 inches by 7
inches by 2.75 inches high. The main spindle shaft is 6 inches wide
and 5 inches thick, with vertical fluting on the facades. The solid
railing sections have rectangular 1 inch beveled recessed panel’s 1
foot 4 inches high and varying in length from 5 feet 4 inches to 7
feet 4.50 inches.
A plaque at the northeast corner of the bridge reads as follows:
Federal Aid Grade Separation
Built Jointly by the Federal Government
State Highway Department
Pere Marquette Railway Company
Board of Oakland county road Commissioners
Under the Supervision of Frank F. Rogers
State Highway Commissioner
The arrangement of staircases is identical for the southwest and
northeast abutment wings, while the northwest abutment staircase
differs only slightly from these. At the first two abutment wings,
pedestrians enter a rectangular landing 8 feet 2 inches long and 5
feet 11.50 inches wide at the highway grade level and make a
quarter-turn to proceed down the stairs. The northwest abutment
stairs differs only in that the landing at the roadway grade level
is a right triangle, with the hypotenuse parallel to the railroad
tracks. The staircases at the three abutments are 5 feet 11.50
inches wide, extend parallel to the abutment wing wall from the
bridge for a total of 49 feet 8.75 inches measured horizontally to a
second corner landing, 16 feet below, measured vertically. The long
staircase has two steps, each with 7 inch risers and 11 inch treads,
then a landing 3 feet 6 inches long, followed by another pair of
steps and a landing, etc. At the second corner landing, 6 feet 5
inches wide and 7 feet 5 inches long, following a quarter-turn there
is a shorter set of stairs 7 feet 5 inches wide, with 7 inch risers
and 11 inch treads, descending the final 13 feet to the railway
grade level.
Staircase railings are solid reinforced concrete 3 feet 3 inches
high, 12 inches thick at the base and cap, but narrowing to 8 inches
in the middle segments, and include rectangular 1 inch beveled
recessed panels 1 foot 4 inches high that reduce the thickness of
the railing to 6 inches. A series of concrete buttresses labeled "counterforts"
that serve as pier support all the staircases from below. They are 1
foot 6 inches thick, 16 feet 6 inches wide at the base, but narrow
to 10 feet six inches wide at the point where the staircase rests
and then taper to only 2 feet 5 inches at the top. They vary in
height depending on the height of the staircase they support.
The southeast abutment varies in general layout and in some minor
details from the other three. The main staircase from the road grade
level is the same as at the other abutments, but is only 5 feet 7
inches wide, and leads to a segmented elevated landing 6 feet 3
inches wide, with one segment 23 feet long and skewed to run
parallel to the rail line, while the second segment, 21 feet 4.50
inches long, is parallel to the road and continues as a 6 foot
sidewalk. The staircase from the landing to railroad grade level is
8 feet 6 inches wide, 14 feet 10.50 inches long, measured
horizontally, and 7 feet high. The dimensions of the treads, risers,
and railings are the same as found at the other abutments.
Sources of Information
Architectural Drawings: Engineering Drawings, X1 of 63-13-2,
prepared by the Michigan State Highway Department, but now owned
by the Oakland County Road Commission, 31001 Lahser Road,
Birmingham, Michigan 48010. This includes 37 sheets drawn in 1925
and 7 additional sheets covering changes made to retaining walls
and railings, date 8 October 1925.
Historic Views: A collection of about 60 negatives taken by
several State Highway Department staff members. Included are 8
views of the crossing and environs in December 1922 and 10 views
taken in 1929-1938 of repairs to the bridge. H. J. Horan, the
State Highway Department Resident Engineer on the project took the
bulk of the construction views shot in 1925. These are found in
the Michigan State Highway Department Collection, Record Group
59-17, State of Michigan Archives, 717 West Allegan Street,
Lansing, Michigan 48918.
Bibliography
Primary and unpublished sources: The Northville Record,
1924-1925.
Secondary and published sources:
Willis F. Dunbar and George S. May, Michigan, A History of
the Wolverine State (Grand Rapids, 1980).
State of Michigan, Eleventh Biennial Report of the State
Highway Commissioner For the Fiscal Years Ending June 30, 1925
and June 30, 1926 (Lansing, 1926).
State of Michigan, Thirteenth Biennial Report of the State
Highway Commissioner For the Fiscal years Ending June 30, 1929
and June 10, 1930 (Lansing, 1931).
State of Michigan, Twenty Sixth Biennial Report of the
State Highway Commissioner For the Fiscal years Ending June 30,
1955 and June 30, 1956 (Lansing, 1956).
Rowena Salow, "The Story of Novi’s Development," M.A. Thesis,
Wayne State University, 1961.
|

|